Sunday, October 15, 2017

Mid October Post

It has been a long four months since work began on the shop, with much patience and teamwork by the hobbitlings doing their part inside.
The Hobbit Wife came to the Mayor's rescue and helped him with the siding installation. As of nightfall last night, all the siding and trim is installed, all the critical caulking is complete, and the gutter and downspout are installed. The rains may REALLY start now.
It's very cool to see a real building that grew out of years of dreaming and some sketches the Mayor drew up in the spring.

Sunday, October 1, 2017