Almost Halloween

Progress on the remodel is continuing at a rapid pace. Here is the glistening concrete levelling course (shower pan was also installed this weekend). Drywall, mud, paint, and then plumbing fixtures are in the near future, with November 9 as the target date to have the work done and permits closed out!
The Mayor was able to get the Bunker to a final permit state, which meant that after 3 long months, the boys could unpack their stuff.
It is hard to describe the joy that was expressed as beloved toys were rediscovered.
 After 3 months, the rattling sound of Danish plastic once again fills the smials at Michael Delving.